LLM4S Production Readiness Roadmap
LLM4S Production Readiness Roadmap
Status: π§ DRAFT π§
Document Version: 0.1.0
Version History:
- v0.1.0 (2025-11-15): Initial draft for review
Last Updated: 2025-11-15 Target: Production-Ready 1.0.0 Release
β οΈ TODO - Before Finalization
This roadmap is currently in DRAFT status. Before implementation begins, the following steps must be completed:
- 1. Discuss and agree roadmap - Review with core maintainers and community stakeholders
- 2. Align issues with roadmap - Create/update GitHub issues to match roadmap phases
- 3. Create project board - Set up GitHub project board for tracking roadmap progress
Once these steps are complete and the roadmap is agreed upon, this DRAFT marker will be removed and implementation can begin.
Table of Contents
- Executive Summary
- Current State Assessment
- Feature Completion Status
- Production Readiness Framework
- Detailed Roadmap
- Timeline and Milestones
- Success Metrics
- Risk Assessment
- Appendix
Executive Summary
LLM4S is a comprehensive framework for building LLM-powered applications in Scala. While the project has made significant progress with multi-provider support, agent frameworks, RAG capabilities, and observability features, several key areas require attention before reaching production readiness.
This roadmap outlines a structured path to achieve production-grade quality across seven key pillars: Testing & Quality Assurance, API Stability, Performance & Scalability, Security & Compliance, Documentation & Developer Experience, Observability & Operations, and Community & Ecosystem.
Current Status: v0.1.x (Pre-Production) Target: v1.0.0 (Production-Ready) Estimated Timeline: 6-9 months
Current State Assessment
Strengths
β
Active Development: 158+ commits in 2025, strong momentum
β
Cross-Platform Support: Scala 2.13 and 3.7 with full cross-compilation
β
Multi-Provider Architecture: OpenAI, Anthropic, Azure OpenAI, Ollama
β
Comprehensive Features: Tool calling, agents, RAG, multimodal support
β
Type-Safe Design: Leveraging Scalaβs type system with Result[A] pattern
β
CI/CD Pipeline: Automated testing, formatting, and release workflows
β
Good Documentation: Detailed design docs, migration guides, API specs
β
Community Engagement: GSoC participation, active Discord, regular talks
β
Maven Central Publishing: Proper artifact distribution
β
Configuration Management: Centralized ConfigReader with Scalafix enforcement
Identified Gaps
β Test Coverage: ~21% test files (target: 80%+ statement coverage) β Integration Testing: Limited end-to-end and integration test scenarios β Performance Benchmarking: No formal performance testing framework β API Stability Guarantees: Still in 0.x versions, no backward compatibility policy β Production Error Handling: Limited patterns for retries, circuit breakers, bulkheads β Security Auditing: No formal security review process β Monitoring in Production: Limited guidance beyond tracing β Deployment Patterns: No reference architectures for production deployments β Breaking Change Process: Unclear migration path for major API changes β Chaos Engineering: No resilience testing framework
Project Metrics
| Metric | Current Value | Target |
|---|---|---|
| Total Scala Files | 269 | - |
| Test Files | 57 (21%) | 150+ (55%+) |
| Statement Coverage | Unknown | 80%+ |
| Documentation Coverage | Good | Excellent |
| Open Issues | Unknown | < 20 |
| TODOs/FIXMEs | 2 | 0 |
| Deprecated APIs | 9 occurrences | 0 |
| Active Contributors | GSoC + 2 maintainers | 10+ |
Feature Completion Status
Core Features
This section tracks the completion status of major LLM4S features and capabilities.
β Completed Features
| Feature | Status | Notes |
|---|---|---|
| Multi-Provider Support | β Complete | OpenAI, Anthropic, Azure OpenAI, Ollama |
| Basic LLM Calling | β Complete | Synchronous completion API |
| Streaming Responses | β Complete | Streaming API for all providers |
| Tool Calling | β Complete | Schema-based tool definitions and execution |
| Message Types | β Complete | User, System, Assistant, Tool messages |
| Configuration Management | β Complete | ConfigReader with Scalafix enforcement |
| Error Handling | β Complete | Result-based error hierarchy |
| Cross-Version Support | β Complete | Scala 2.13 and 3.7 compatibility |
| Workspace Containers | β Complete | Docker-based isolated execution |
| Tracing Support | β Complete | Langfuse and console tracing |
| Image Generation | β Complete | Stable Diffusion and Hugging Face |
| Speech-to-Text | β Complete | Vosk integration |
| Text-to-Speech | β Complete | TTS support |
| Image Processing | β Complete | Claude Vision and similar |
π§ In Progress Features
| Feature | Status | Completion % | Blocking Issues | Target |
|---|---|---|---|---|
| RAG (Retrieval-Augmented Generation) | π§ In Progress | ~70% | Missing: Vector store integrations, chunking strategies | Month 3 |
| Agent Framework | π§ In Progress | ~60% | Missing: Multi-agent orchestration patterns, state persistence | Month 4 |
| MCP (Model Context Protocol) | π§ In Progress | ~50% | Missing: Full protocol implementation, examples | Month 3 |
| Advanced Embeddings | π§ In Progress | ~60% | Missing: Multiple provider support, caching | Month 3 |
π Planned Features
| Feature | Priority | Description | Target Milestone |
|---|---|---|---|
| RAG - Vector Database Integrations | P0 | Postgres pgvector, Qdrant, Weaviate, Elasticsearch | Phase 1.2 |
| RAG - Document Chunking | P0 | Smart chunking strategies for different document types | Phase 1.2 |
| RAG - Semantic Search | P0 | Hybrid search (keyword + semantic) | Phase 1.2 |
| Agent - State Persistence | P1 | Save/restore agent state for long-running workflows | Phase 1.3 |
| Agent - Multi-Agent Communication | P1 | Agent-to-agent messaging and coordination | Phase 1.3 |
| Agent - Tool Composition | P1 | Compose tools into higher-level capabilities | Phase 1.3 |
| MCP - Server Implementation | P1 | Full MCP server for context sharing | Phase 1.2 |
| Prompt Management | P2 | Template system with variable substitution | Phase 2 |
| Caching Layer | P2 | Cache LLM responses for cost/latency optimization | Phase 2 |
| Function Calling v2 | P2 | Parallel tool calls, tool choice strategies | Phase 2 |
| Guardrails | P2 | Input/output validation and safety checks | Phase 3 |
| Cost Tracking | P2 | Token usage tracking and cost estimation | Phase 2 |
β Deferred Features
| Feature | Reason | Potential Future Release |
|---|---|---|
| Fine-tuning Support | Low priority for initial 1.0 | Post-1.0 (v1.2+) |
| Custom Model Hosting | Niche use case | Post-1.0 (v1.3+) |
| GraphQL API | Not core to library | Post-1.0 (community plugin) |
Feature Dependencies
The following features have dependencies that must be completed first:
RAG Pipeline (Full)
βββ Vector Database Integrations (P0) β Blocks production RAG
βββ Document Chunking (P0) β Blocks production RAG
βββ Semantic Search (P0) β Blocks production RAG
Agent Framework (Full)
βββ State Persistence (P1) β Needed for production agents
βββ Multi-Agent Communication (P1) β Blocks complex workflows
βββ Tool Composition (P1) β Improves agent capabilities
MCP Support (Full)
βββ Server Implementation (P1) β Blocks MCP adoption
Feature Completion Roadmap
Phase 1 (Months 1-3): Core Feature Completion
- Complete RAG pipeline with vector store integrations
- Finalize agent framework with state persistence
- Complete MCP implementation
Phase 2 (Months 4-5): Advanced Features
- Prompt management system
- Caching layer
- Cost tracking and monitoring
Phase 3 (Month 6): Production Hardening
- Guardrails and safety
- Performance optimization
- Final integration testing
Production Readiness Framework
We adopt a Seven-Pillar Framework for production readiness:
ββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ
β PRODUCTION READINESS β
ββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ€
β 1. Testing & Quality Assurance β
β 2. API Stability & Versioning β
β 3. Performance & Scalability β
β 4. Security & Compliance β
β 5. Documentation & Developer Experience β
β 6. Observability & Operations β
β 7. Community & Ecosystem β
ββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ
Each pillar has specific criteria that must be met before declaring production readiness.
Detailed Roadmap
Pillar 1: Testing & Quality Assurance
Goal: Achieve 80%+ statement coverage with comprehensive unit, integration, and end-to-end tests.
Phase 1.1: Unit Test Coverage (Priority: P0)
Timeline: Months 1-2 Owner: Core Team + Community
Tasks:
- Audit Current Coverage: Run
sbt covand identify untested modules - Create Testing Guidelines: Document test patterns and best practices
- Location:
docs/TESTING_GUIDE.md - Include: mocking patterns, fixture setup, async testing
- Location:
- Core Module Tests (Target: 90% coverage)
llmconnect: Provider implementations, retry logic, streamingconfig: ConfigReader validation, environment parsingerror: Error hierarchy, recovery patternstoolapi: Tool function execution, schema validationagent: Agent state management, orchestrationtrace: Tracing backends, token counting
- Workspace Module Tests (Target: 80% coverage)
workspaceClient: Docker communication, file operationsworkspaceShared: Protocol validation
- Enable Coverage Enforcement
- Set
coverageFailOnMinimum := trueinbuild.sbt - Add coverage reports to CI/CD pipeline
- Set
Related Issues: None yet Dependencies: None
Phase 1.2: Integration Testing (Priority: P0)
Timeline: Months 2-3 Owner: Core Team
Tasks:
- Integration Test Framework
- Create
modules/integration-testsdirectory - Set up test containers for dependencies (Postgres, Docker)
- Mock LLM provider responses for deterministic tests
- Create
- Provider Integration Tests
- OpenAI: Complete workflow including tool calls
- Anthropic: Complete workflow including tool calls
- Azure OpenAI: Complete workflow including tool calls
- Ollama: Local provider integration
- RAG Pipeline Tests
- Document ingestion β Embedding β Storage β Retrieval
- Multi-provider embedding tests
- Agent Workflow Tests
- Single-agent task completion
- Multi-agent orchestration
- Tool execution within agents
- Tracing Integration Tests
- Langfuse integration end-to-end
- Console tracing output validation
Related Docs: docs/workspace-agent-protocol.md
Dependencies: Phase 1.1
Phase 1.3: End-to-End Scenarios (Priority: P1)
Timeline: Month 3 Owner: Core Team
Tasks:
- Create Reference Applications
- Chatbot with tool calling
- Document Q&A system (RAG)
- Multi-agent research assistant
- E2E Test Suite
- User journey tests covering full workflows
- Cross-provider compatibility tests
- Streaming vs. non-streaming equivalence tests
Related Docs: README.md (samples section)
Dependencies: Phase 1.2
Phase 1.4: Property-Based and Fuzzing Tests (Priority: P2)
Timeline: Month 4 Owner: Community + Core Team
Tasks:
- Add ScalaCheck Dependency
- Property-based testing for data transformations
- Fuzz Testing for Tool Schemas
- Generate random schemas and validate JSON Schema output
- Fuzz Testing for Config Parsing
- Test malformed configurations, edge cases
Dependencies: Phase 1.1
Pillar 2: API Stability & Versioning
Goal: Stable 1.0 API with clear versioning policy and backward compatibility guarantees.
Phase 2.1: API Audit (Priority: P0)
Timeline: Month 1 Owner: Core Team
Tasks:
- Document Public API Surface
- Identify all public classes, traits, methods
- Mark internal APIs with
private[llm4s]
- Identify Breaking Changes
- Review deprecated APIs (9 occurrences found)
- Plan migration path for removals
- Versioning Policy
- Create
docs/VERSIONING_POLICY.md - Define SemVer rules for Scala libraries
- Document binary compatibility commitments
- Create
Related Docs: docs/MIGRATION_GUIDE.md
Dependencies: None
Phase 2.2: Binary Compatibility Checks (Priority: P0)
Timeline: Month 2 Owner: Core Team
Tasks:
- Enable MiMa (Migration Manager)
- Already in
build.sbt:mimaPreviousArtifacts := Set(...) - Configure for 1.0.0 baseline
- Already in
- Document Breaking Change Process
- Add to
CONTRIBUTING.md - Require MiMa checks in CI/CD
- Add to
- Deprecation Warnings
- Mark all deprecated APIs with
@deprecatedannotation - Provide clear migration instructions
- Mark all deprecated APIs with
Related Issues: None yet Dependencies: Phase 2.1
Phase 2.3: API Freeze for 1.0 (Priority: P0)
Timeline: Month 5 (before 1.0-RC1) Owner: Core Team
Tasks:
- Feature Freeze
- No new public APIs after RC1
- Only bug fixes and documentation updates
- Release Candidate Testing
- Publish 1.0.0-RC1, RC2, etc.
- Gather community feedback
- Final API Review
- Review all public method signatures
- Ensure consistency across modules
Related Docs: docs/RELEASE.md
Dependencies: All Phase 2 tasks
Pillar 3: Performance & Scalability
Goal: Achieve predictable performance with benchmarks for all critical paths.
Phase 3.1: Performance Benchmarking Framework (Priority: P1)
Timeline: Months 2-3 Owner: Core Team
Tasks:
- Add JMH Dependency
- Java Microbenchmark Harness for accurate benchmarks
- Create Benchmarks Module
modules/benchmarks/directory- Benchmark LLM client throughput, latency
- Benchmark tool execution overhead
- Benchmark RAG pipeline performance
- Baseline Metrics
- Establish performance baselines for 1.0
- Document in
docs/PERFORMANCE.md
Dependencies: None
Phase 3.2: Memory and Resource Optimization (Priority: P1)
Timeline: Month 4 Owner: Core Team
Tasks:
- Memory Profiling
- Profile memory usage with YourKit/VisualVM
- Identify memory leaks in long-running processes
- Resource Management
- Ensure proper cleanup in
LLMClient.close() - Review connection pooling (HikariCP configuration)
- Document resource limits in workspace containers
- Ensure proper cleanup in
Related Docs: docs/workspace-agent-protocol.md
Dependencies: Phase 3.1
Phase 3.3: Scalability Testing (Priority: P2)
Timeline: Month 5 Owner: Community + Core Team
Tasks:
- Load Testing Framework
- Gatling or similar for load testing
- Test concurrent LLM requests
- Horizontal Scaling Validation
- Test multiple workspace containers
- Test connection pooling under load
- Publish Scalability Guide
- Location:
docs/SCALABILITY_GUIDE.md - Include: connection pooling, rate limiting, caching strategies
- Location:
Dependencies: Phase 3.1, Phase 3.2
Pillar 4: Security & Compliance
Goal: Secure-by-default with clear security policies and regular audits.
Phase 4.1: Security Audit (Priority: P0)
Timeline: Month 3 Owner: Core Team + External Auditor
Tasks:
- Code Security Review
- Review for SQL injection, XSS, command injection
- Review API key handling (ensure
ApiKeytype prevents logging) - Review workspace container isolation
- Dependency Vulnerability Scanning
- Integrate Snyk or Dependabot
- Automate vulnerability alerts in CI/CD
- Document Security Best Practices
- Location:
docs/SECURITY.md - Include: API key management, network security, container security
- Location:
Related Docs: CLAUDE.md (mentions avoiding security vulnerabilities)
Dependencies: None
Phase 4.2: Secrets Management (Priority: P0)
Timeline: Month 3 Owner: Core Team
Tasks:
- Secrets Handling Guidelines
- Document use of environment variables
- Recommend vault integration (HashiCorp Vault, AWS Secrets Manager)
- Prevent Secret Leakage
- Review
ApiKey.toStringimplementation (already redacted) - Audit logging to ensure no secrets in logs
- Review
- Security Policy
- Create
SECURITY.mdwith vulnerability reporting process
- Create
Dependencies: None
Phase 4.3: Compliance Documentation (Priority: P2)
Timeline: Month 6 Owner: Core Team
Tasks:
- License Compliance
- Audit all dependencies for license compatibility
- Document in
LICENSES.md
- GDPR/Privacy Considerations
- Document data handling for LLM interactions
- Provide guidance on PII handling
- Supply Chain Security
- Sign all release artifacts (already enabled in
release.yml) - Document build reproducibility
- Sign all release artifacts (already enabled in
Related Docs: LICENSE (currently Apache 2.0)
Dependencies: Phase 4.1
Pillar 5: Documentation & Developer Experience
Goal: Comprehensive, up-to-date documentation that enables rapid onboarding.
Phase 5.1: Documentation Audit (Priority: P0)
Timeline: Month 2 Owner: Community + Core Team
Tasks:
- Audit Existing Docs
- Review all
.mdfiles for accuracy - Identify gaps in coverage
- Review all
- Create Missing Guides
docs/GETTING_STARTED.md- Quick start beyond READMEdocs/ARCHITECTURE.md- Detailed architecture overviewdocs/TESTING_GUIDE.md- How to write testsdocs/PRODUCTION_DEPLOYMENT.md- Deployment patternsdocs/TROUBLESHOOTING.md- Common issues and solutions
- Update Existing Docs
docs/AGENTS.md- Expand with more examplesdocs/MIGRATION_GUIDE.md- Add 0.x β 1.0 migrationdocs/tool-calling-api-design.md- Update with latest API
Related Docs: All docs in docs/
Dependencies: None
Phase 5.2: API Documentation (Priority: P0)
Timeline: Month 3 Owner: Core Team
Tasks:
- ScalaDoc Coverage
- Ensure all public APIs have ScalaDoc
- Target: 100% ScalaDoc coverage on public APIs
- Generate API Documentation Site
- Use sbt-site or similar
- Publish to GitHub Pages
- Interactive Examples
- Use mdoc or similar for executable docs
- Embed working code snippets in documentation
Dependencies: Phase 5.1
Phase 5.3: Developer Onboarding (Priority: P1)
Timeline: Month 4 Owner: Community + Core Team
Tasks:
- Contributor Guide
- Expand
CONTRIBUTING.md - Include: coding standards, PR process, review guidelines
- Expand
- Video Tutorials
- Create YouTube playlist with:
- Getting started (5 min)
- Building a chatbot (15 min)
- Advanced: Multi-agent system (30 min)
- Create YouTube playlist with:
- Improve Starter Kit
- Update
llm4s.g8template - Add more example projects
- Update
Related Docs: docs/llm4s-g8-starter-kit.md
Dependencies: Phase 5.1
Pillar 6: Observability & Operations
Goal: Production-grade observability with monitoring, alerting, and debugging capabilities.
Phase 6.1: Enhanced Tracing (Priority: P1)
Timeline: Month 3 Owner: Core Team
Tasks:
- Distributed Tracing
- Integrate OpenTelemetry
- Support trace context propagation
- Structured Logging
- Standardize log formats (JSON logs)
- Document log levels and verbosity
- Custom Metrics
- Add Prometheus metrics exporter
- Track: request latency, token usage, error rates
Related Docs: docs/langfuse-workflow-patterns.md
Dependencies: None
Phase 6.2: Production Monitoring Guide (Priority: P1)
Timeline: Month 4 Owner: Core Team
Tasks:
- Monitoring Best Practices
- Location:
docs/MONITORING.md - Include: key metrics, alerting thresholds
- Location:
- Healthcheck Endpoints
- Add
/healthand/readyendpoints for LLM clients - Document in workspace protocol
- Add
- Error Budget and SLOs
- Define service level objectives
- Document in
docs/SLO.md
Related Docs: docs/workspace-agent-protocol.md
Dependencies: Phase 6.1
Phase 6.3: Operational Runbooks (Priority: P2)
Timeline: Month 5 Owner: Core Team
Tasks:
- Incident Response Runbooks
- Common failures: API rate limits, timeouts, out-of-memory
- Document recovery procedures
- Capacity Planning Guide
- Estimate resource requirements for different scales
- Document in
docs/CAPACITY_PLANNING.md
Dependencies: Phase 6.1, Phase 6.2
Pillar 7: Community & Ecosystem
Goal: Thriving community with active contributors and a growing ecosystem.
Phase 7.1: Community Growth (Priority: P1)
Timeline: Ongoing Owner: Maintainers
Tasks:
- Expand Contributor Base
- Target: 10+ active contributors
- Label βgood first issueβ for new contributors
- Monthly contributor recognition
- Regular Dev Hours
- Continue weekly LLM4S Dev Hour (Sundays 9am London)
- Publish session notes and recordings
- Conference Talks
- Continue presenting at Scala conferences
- Target: 2-3 talks per quarter
Related Docs: README.md (Dev Hour section)
Dependencies: None
Phase 7.2: Ecosystem Integration (Priority: P2)
Timeline: Month 5 Owner: Community + Core Team
Tasks:
- Framework Integrations
- Akka/Pekko integration guide
- ZIO integration guide
- Cats Effect integration guide
- Play Framework integration guide
- Database Integrations
- Postgres vector extension (pgvector)
- Elasticsearch integration
- Qdrant/Weaviate integration
- Monitoring Integrations
- Datadog integration
- New Relic integration
Dependencies: None
Phase 7.3: Plugins and Extensions (Priority: P2)
Timeline: Month 6+ Owner: Community
Tasks:
- Plugin Architecture
- Define plugin SPI (Service Provider Interface)
- Document in
docs/PLUGINS.md
- Community Plugins
- Encourage community-contributed providers
- Examples: Google Gemini, Cohere, local models
- Marketplace/Registry
- Create plugin registry on llm4s.org
- Include: verified plugins, ratings, documentation
Dependencies: Phase 2.3 (stable API)
Timeline and Milestones
Overview
Month 1-2: Foundation (Testing + API Audit)
Month 3-4: Hardening (Security + Performance)
Month 5: Stabilization (RC releases)
Month 6+: Launch & Growth (1.0.0 release)
Detailed Timeline
| Month | Milestone | Deliverables | Exit Criteria |
|---|---|---|---|
| Month 1 | Foundation Setup | - Test coverage audit - API surface documentation - Security audit initiation |
- Coverage report available - Public API list documented |
| Month 2 | Testing Infrastructure | - Unit test coverage >60% - Integration test framework - Documentation audit complete |
- Coverage passing 60% - Integration tests runnable |
| Month 3 | Hardening | - Security audit complete - Performance benchmarks - Enhanced tracing |
- No critical vulnerabilities - Baselines established |
| Month 4 | Optimization | - Unit test coverage >80% - API documentation site - Monitoring guide |
- Coverage passing 80% - Docs site live |
| Month 5 | Stabilization | - 1.0.0-RC1 release - API freeze - E2E scenarios |
- RC1 published - No open P0 bugs |
| Month 6 | Launch Prep | - 1.0.0-RC2 (if needed) - Final documentation review - Launch communications |
- Community sign-off - All P0/P1 tasks complete |
| Month 6+ | 1.0.0 Release | - Production release - Launch blog post - Community celebration |
- 1.0.0 published to Maven Central |
| Post-1.0 | Growth Phase | - Plugin ecosystem - Framework integrations - Continued improvements |
- 3+ community plugins - 2+ framework guides |
Release Candidates Schedule
1.0.0-RC1: Month 5, Week 1
β (2 weeks of community testing)
1.0.0-RC2: Month 5, Week 3 (if needed)
β (2 weeks of final validation)
1.0.0: Month 6, Week 1
Success Metrics
Quantitative Metrics
| Category | Metric | Current | Target (1.0) | Target (6mo post-1.0) |
|---|---|---|---|---|
| Quality | Statement Coverage | ~21% | 80% | 85% |
| Quality | Critical Bugs | Unknown | 0 | 0 |
| Quality | Open P0/P1 Issues | Unknown | <5 | <10 |
| Community | Contributors | 6 (GSoC+2) | 10+ | 20+ |
| Community | GitHub Stars | Current | +50% | +100% |
| Community | Discord Members | Current | +100 | +300 |
| Adoption | Maven Central Downloads | Current | 500/mo | 2000/mo |
| Adoption | Production Users | 0 | 5 | 20 |
| Documentation | ScalaDoc Coverage | <50% | 100% (public APIs) | 100% |
| Documentation | Guide Completeness | 60% | 95% | 100% |
Qualitative Metrics
- Developer Satisfaction: Survey developers on ease of use, documentation quality
- API Stability: Zero unplanned breaking changes in 1.0.x series
- Community Health: Active Discord discussions, regular contributions
- Production Readiness: At least 3 case studies of production deployments
Risk Assessment
High-Risk Areas
Risk 1: Low Test Coverage Delays 1.0
Likelihood: High Impact: High Mitigation:
- Prioritize P0 testing tasks
- Engage community via βtest bountyβ program
- Parallelize test writing across modules
Risk 2: Breaking API Changes Required
Likelihood: Medium Impact: High Mitigation:
- Thorough API audit in Month 1
- Early RC releases for feedback
- Maintain compatibility layer for common patterns
Risk 3: Security Vulnerability Discovered
Likelihood: Medium Impact: High Mitigation:
- Complete security audit by Month 3
- Establish security response process
- Regular dependency scanning
Risk 4: Performance Regressions
Likelihood: Medium Impact: Medium Mitigation:
- Establish baselines early (Month 2)
- Add performance tests to CI/CD
- Monitor JMH benchmarks on every PR
Medium-Risk Areas
Risk 5: Insufficient Documentation
Likelihood: Low Impact: Medium Mitigation:
- Documentation sprints in Months 2 & 4
- Community documentation days
- Reward documentation contributions
Risk 6: Community Contributor Burnout
Likelihood: Medium Impact: Low Mitigation:
- Distribute work across multiple contributors
- Recognize and reward contributions
- Maintain sustainable pace
Appendix
A. Related Documents
- CLAUDE.md - AI Assistant Guide
- README.md - Project Overview
- AGENTS.md - Agent Framework
- MIGRATION_GUIDE.md - API Migrations
- RELEASE.md - Release Process
- TEST_COVERAGE.md - Coverage Guide
- tool-calling-api-design.md - Tool API Design
- workspace-agent-protocol.md - Workspace Protocol
B. Recommended GitHub Issues
Based on this roadmap, we recommend creating the following GitHub issues:
Testing & Quality:
- #TBD: Achieve 80% statement coverage across core modules
- #TBD: Create integration test framework
- #TBD: Add E2E test scenarios for reference applications
- #TBD: Enable coverage enforcement in CI/CD
API Stability:
- #TBD: Document public API surface area
- #TBD: Create versioning policy document
- #TBD: Deprecation and migration path for 0.x APIs
- #TBD: API freeze for 1.0.0-RC1
Performance:
- #TBD: Set up JMH benchmarking framework
- #TBD: Establish performance baselines
- #TBD: Memory profiling and optimization
- #TBD: Scalability testing and documentation
Security:
- #TBD: Conduct security audit
- #TBD: Integrate dependency vulnerability scanning
- #TBD: Create SECURITY.md with reporting process
- #TBD: Review and audit secrets management
Documentation:
- #TBD: Documentation audit and gap analysis
- #TBD: Create missing documentation guides
- #TBD: 100% ScalaDoc coverage on public APIs
- #TBD: Set up API documentation site (GitHub Pages)
Observability:
- #TBD: Integrate OpenTelemetry for distributed tracing
- #TBD: Add Prometheus metrics exporter
- #TBD: Create monitoring best practices guide
- #TBD: Add healthcheck endpoints
Community:
- #TBD: Label βgood first issuesβ for new contributors
- #TBD: Create framework integration guides (ZIO, Cats Effect, etc.)
- #TBD: Define plugin architecture
C. Contributing to This Roadmap
This roadmap is a living document. To propose changes:
- Open an issue on GitHub with the
roadmaplabel - Discuss in the
#roadmapDiscord channel - Submit a PR updating this document
- Maintainers will review and merge approved changes
D. Roadmap Tracking
Progress on this roadmap will be tracked via:
- GitHub Project Board: LLM4S Production Roadmap
- Monthly Updates: Published on Discord and mailing list
- Quarterly Reviews: Major milestones reviewed by maintainers and community
Document Version: 1.0 Next Review: 2025-12-15 Maintainers: Rory Graves, Kannupriya Kalra Contributors: Community input welcome via GitHub issues