LLM4S Production Readiness Roadmap

Status: 🚧 DRAFT 🚧

Document Version: 0.1.0

Version History:

  • v0.1.0 (2025-11-15): Initial draft for review

Last Updated: 2025-11-15 Target: Production-Ready 1.0.0 Release


⚠️ TODO - Before Finalization

This roadmap is currently in DRAFT status. Before implementation begins, the following steps must be completed:

  • 1. Discuss and agree roadmap - Review with core maintainers and community stakeholders
  • 2. Align issues with roadmap - Create/update GitHub issues to match roadmap phases
  • 3. Create project board - Set up GitHub project board for tracking roadmap progress

Once these steps are complete and the roadmap is agreed upon, this DRAFT marker will be removed and implementation can begin.


Table of Contents

  1. Executive Summary
  2. Current State Assessment
  3. Feature Completion Status
  4. Production Readiness Framework
  5. Detailed Roadmap
  6. Timeline and Milestones
  7. Success Metrics
  8. Risk Assessment
  9. Appendix

Executive Summary

LLM4S is a comprehensive framework for building LLM-powered applications in Scala. While the project has made significant progress with multi-provider support, agent frameworks, RAG capabilities, and observability features, several key areas require attention before reaching production readiness.

This roadmap outlines a structured path to achieve production-grade quality across seven key pillars: Testing & Quality Assurance, API Stability, Performance & Scalability, Security & Compliance, Documentation & Developer Experience, Observability & Operations, and Community & Ecosystem.

Current Status: v0.1.x (Pre-Production) Target: v1.0.0 (Production-Ready) Estimated Timeline: 6-9 months


Current State Assessment

Strengths

βœ… Active Development: 158+ commits in 2025, strong momentum βœ… Cross-Platform Support: Scala 2.13 and 3.7 with full cross-compilation βœ… Multi-Provider Architecture: OpenAI, Anthropic, Azure OpenAI, Ollama βœ… Comprehensive Features: Tool calling, agents, RAG, multimodal support βœ… Type-Safe Design: Leveraging Scala’s type system with Result[A] pattern βœ… CI/CD Pipeline: Automated testing, formatting, and release workflows βœ… Good Documentation: Detailed design docs, migration guides, API specs βœ… Community Engagement: GSoC participation, active Discord, regular talks βœ… Maven Central Publishing: Proper artifact distribution βœ… Configuration Management: Centralized ConfigReader with Scalafix enforcement

Identified Gaps

❌ Test Coverage: ~21% test files (target: 80%+ statement coverage) ❌ Integration Testing: Limited end-to-end and integration test scenarios ❌ Performance Benchmarking: No formal performance testing framework ❌ API Stability Guarantees: Still in 0.x versions, no backward compatibility policy ❌ Production Error Handling: Limited patterns for retries, circuit breakers, bulkheads ❌ Security Auditing: No formal security review process ❌ Monitoring in Production: Limited guidance beyond tracing ❌ Deployment Patterns: No reference architectures for production deployments ❌ Breaking Change Process: Unclear migration path for major API changes ❌ Chaos Engineering: No resilience testing framework

Project Metrics

Metric Current Value Target
Total Scala Files 269 -
Test Files 57 (21%) 150+ (55%+)
Statement Coverage Unknown 80%+
Documentation Coverage Good Excellent
Open Issues Unknown < 20
TODOs/FIXMEs 2 0
Deprecated APIs 9 occurrences 0
Active Contributors GSoC + 2 maintainers 10+

Feature Completion Status

Core Features

This section tracks the completion status of major LLM4S features and capabilities.

βœ… Completed Features

Feature Status Notes
Multi-Provider Support βœ… Complete OpenAI, Anthropic, Azure OpenAI, Ollama
Basic LLM Calling βœ… Complete Synchronous completion API
Streaming Responses βœ… Complete Streaming API for all providers
Tool Calling βœ… Complete Schema-based tool definitions and execution
Message Types βœ… Complete User, System, Assistant, Tool messages
Configuration Management βœ… Complete ConfigReader with Scalafix enforcement
Error Handling βœ… Complete Result-based error hierarchy
Cross-Version Support βœ… Complete Scala 2.13 and 3.7 compatibility
Workspace Containers βœ… Complete Docker-based isolated execution
Tracing Support βœ… Complete Langfuse and console tracing
Image Generation βœ… Complete Stable Diffusion and Hugging Face
Speech-to-Text βœ… Complete Vosk integration
Text-to-Speech βœ… Complete TTS support
Image Processing βœ… Complete Claude Vision and similar

🚧 In Progress Features

Feature Status Completion % Blocking Issues Target
RAG (Retrieval-Augmented Generation) 🚧 In Progress ~70% Missing: Vector store integrations, chunking strategies Month 3
Agent Framework 🚧 In Progress ~60% Missing: Multi-agent orchestration patterns, state persistence Month 4
MCP (Model Context Protocol) 🚧 In Progress ~50% Missing: Full protocol implementation, examples Month 3
Advanced Embeddings 🚧 In Progress ~60% Missing: Multiple provider support, caching Month 3

πŸ“‹ Planned Features

Feature Priority Description Target Milestone
RAG - Vector Database Integrations P0 Postgres pgvector, Qdrant, Weaviate, Elasticsearch Phase 1.2
RAG - Document Chunking P0 Smart chunking strategies for different document types Phase 1.2
RAG - Semantic Search P0 Hybrid search (keyword + semantic) Phase 1.2
Agent - State Persistence P1 Save/restore agent state for long-running workflows Phase 1.3
Agent - Multi-Agent Communication P1 Agent-to-agent messaging and coordination Phase 1.3
Agent - Tool Composition P1 Compose tools into higher-level capabilities Phase 1.3
MCP - Server Implementation P1 Full MCP server for context sharing Phase 1.2
Prompt Management P2 Template system with variable substitution Phase 2
Caching Layer P2 Cache LLM responses for cost/latency optimization Phase 2
Function Calling v2 P2 Parallel tool calls, tool choice strategies Phase 2
Guardrails P2 Input/output validation and safety checks Phase 3
Cost Tracking P2 Token usage tracking and cost estimation Phase 2

❌ Deferred Features

Feature Reason Potential Future Release
Fine-tuning Support Low priority for initial 1.0 Post-1.0 (v1.2+)
Custom Model Hosting Niche use case Post-1.0 (v1.3+)
GraphQL API Not core to library Post-1.0 (community plugin)

Feature Dependencies

The following features have dependencies that must be completed first:

RAG Pipeline (Full)
  β”œβ”€β”€ Vector Database Integrations (P0) ← Blocks production RAG
  β”œβ”€β”€ Document Chunking (P0) ← Blocks production RAG
  └── Semantic Search (P0) ← Blocks production RAG

Agent Framework (Full)
  β”œβ”€β”€ State Persistence (P1) ← Needed for production agents
  β”œβ”€β”€ Multi-Agent Communication (P1) ← Blocks complex workflows
  └── Tool Composition (P1) ← Improves agent capabilities

MCP Support (Full)
  └── Server Implementation (P1) ← Blocks MCP adoption

Feature Completion Roadmap

Phase 1 (Months 1-3): Core Feature Completion

  • Complete RAG pipeline with vector store integrations
  • Finalize agent framework with state persistence
  • Complete MCP implementation

Phase 2 (Months 4-5): Advanced Features

  • Prompt management system
  • Caching layer
  • Cost tracking and monitoring

Phase 3 (Month 6): Production Hardening

  • Guardrails and safety
  • Performance optimization
  • Final integration testing

Production Readiness Framework

We adopt a Seven-Pillar Framework for production readiness:

β”Œβ”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”
β”‚                   PRODUCTION READINESS                      β”‚
β”œβ”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€
β”‚  1. Testing & Quality Assurance                            β”‚
β”‚  2. API Stability & Versioning                             β”‚
β”‚  3. Performance & Scalability                              β”‚
β”‚  4. Security & Compliance                                  β”‚
β”‚  5. Documentation & Developer Experience                   β”‚
β”‚  6. Observability & Operations                             β”‚
β”‚  7. Community & Ecosystem                                  β”‚
β””β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”˜

Each pillar has specific criteria that must be met before declaring production readiness.


Detailed Roadmap

Pillar 1: Testing & Quality Assurance

Goal: Achieve 80%+ statement coverage with comprehensive unit, integration, and end-to-end tests.

Phase 1.1: Unit Test Coverage (Priority: P0)

Timeline: Months 1-2 Owner: Core Team + Community

Tasks:

  • Audit Current Coverage: Run sbt cov and identify untested modules
  • Create Testing Guidelines: Document test patterns and best practices
    • Location: docs/TESTING_GUIDE.md
    • Include: mocking patterns, fixture setup, async testing
  • Core Module Tests (Target: 90% coverage)
    • llmconnect: Provider implementations, retry logic, streaming
    • config: ConfigReader validation, environment parsing
    • error: Error hierarchy, recovery patterns
    • toolapi: Tool function execution, schema validation
    • agent: Agent state management, orchestration
    • trace: Tracing backends, token counting
  • Workspace Module Tests (Target: 80% coverage)
    • workspaceClient: Docker communication, file operations
    • workspaceShared: Protocol validation
  • Enable Coverage Enforcement
    • Set coverageFailOnMinimum := true in build.sbt
    • Add coverage reports to CI/CD pipeline

Related Issues: None yet Dependencies: None

Phase 1.2: Integration Testing (Priority: P0)

Timeline: Months 2-3 Owner: Core Team

Tasks:

  • Integration Test Framework
    • Create modules/integration-tests directory
    • Set up test containers for dependencies (Postgres, Docker)
    • Mock LLM provider responses for deterministic tests
  • Provider Integration Tests
    • OpenAI: Complete workflow including tool calls
    • Anthropic: Complete workflow including tool calls
    • Azure OpenAI: Complete workflow including tool calls
    • Ollama: Local provider integration
  • RAG Pipeline Tests
    • Document ingestion β†’ Embedding β†’ Storage β†’ Retrieval
    • Multi-provider embedding tests
  • Agent Workflow Tests
    • Single-agent task completion
    • Multi-agent orchestration
    • Tool execution within agents
  • Tracing Integration Tests
    • Langfuse integration end-to-end
    • Console tracing output validation

Related Docs: docs/workspace-agent-protocol.md Dependencies: Phase 1.1

Phase 1.3: End-to-End Scenarios (Priority: P1)

Timeline: Month 3 Owner: Core Team

Tasks:

  • Create Reference Applications
    • Chatbot with tool calling
    • Document Q&A system (RAG)
    • Multi-agent research assistant
  • E2E Test Suite
    • User journey tests covering full workflows
    • Cross-provider compatibility tests
    • Streaming vs. non-streaming equivalence tests

Related Docs: README.md (samples section) Dependencies: Phase 1.2

Phase 1.4: Property-Based and Fuzzing Tests (Priority: P2)

Timeline: Month 4 Owner: Community + Core Team

Tasks:

  • Add ScalaCheck Dependency
    • Property-based testing for data transformations
  • Fuzz Testing for Tool Schemas
    • Generate random schemas and validate JSON Schema output
  • Fuzz Testing for Config Parsing
    • Test malformed configurations, edge cases

Dependencies: Phase 1.1


Pillar 2: API Stability & Versioning

Goal: Stable 1.0 API with clear versioning policy and backward compatibility guarantees.

Phase 2.1: API Audit (Priority: P0)

Timeline: Month 1 Owner: Core Team

Tasks:

  • Document Public API Surface
    • Identify all public classes, traits, methods
    • Mark internal APIs with private[llm4s]
  • Identify Breaking Changes
    • Review deprecated APIs (9 occurrences found)
    • Plan migration path for removals
  • Versioning Policy
    • Create docs/VERSIONING_POLICY.md
    • Define SemVer rules for Scala libraries
    • Document binary compatibility commitments

Related Docs: docs/MIGRATION_GUIDE.md Dependencies: None

Phase 2.2: Binary Compatibility Checks (Priority: P0)

Timeline: Month 2 Owner: Core Team

Tasks:

  • Enable MiMa (Migration Manager)
    • Already in build.sbt: mimaPreviousArtifacts := Set(...)
    • Configure for 1.0.0 baseline
  • Document Breaking Change Process
    • Add to CONTRIBUTING.md
    • Require MiMa checks in CI/CD
  • Deprecation Warnings
    • Mark all deprecated APIs with @deprecated annotation
    • Provide clear migration instructions

Related Issues: None yet Dependencies: Phase 2.1

Phase 2.3: API Freeze for 1.0 (Priority: P0)

Timeline: Month 5 (before 1.0-RC1) Owner: Core Team

Tasks:

  • Feature Freeze
    • No new public APIs after RC1
    • Only bug fixes and documentation updates
  • Release Candidate Testing
    • Publish 1.0.0-RC1, RC2, etc.
    • Gather community feedback
  • Final API Review
    • Review all public method signatures
    • Ensure consistency across modules

Related Docs: docs/RELEASE.md Dependencies: All Phase 2 tasks


Pillar 3: Performance & Scalability

Goal: Achieve predictable performance with benchmarks for all critical paths.

Phase 3.1: Performance Benchmarking Framework (Priority: P1)

Timeline: Months 2-3 Owner: Core Team

Tasks:

  • Add JMH Dependency
    • Java Microbenchmark Harness for accurate benchmarks
  • Create Benchmarks Module
    • modules/benchmarks/ directory
    • Benchmark LLM client throughput, latency
    • Benchmark tool execution overhead
    • Benchmark RAG pipeline performance
  • Baseline Metrics
    • Establish performance baselines for 1.0
    • Document in docs/PERFORMANCE.md

Dependencies: None

Phase 3.2: Memory and Resource Optimization (Priority: P1)

Timeline: Month 4 Owner: Core Team

Tasks:

  • Memory Profiling
    • Profile memory usage with YourKit/VisualVM
    • Identify memory leaks in long-running processes
  • Resource Management
    • Ensure proper cleanup in LLMClient.close()
    • Review connection pooling (HikariCP configuration)
    • Document resource limits in workspace containers

Related Docs: docs/workspace-agent-protocol.md Dependencies: Phase 3.1

Phase 3.3: Scalability Testing (Priority: P2)

Timeline: Month 5 Owner: Community + Core Team

Tasks:

  • Load Testing Framework
    • Gatling or similar for load testing
    • Test concurrent LLM requests
  • Horizontal Scaling Validation
    • Test multiple workspace containers
    • Test connection pooling under load
  • Publish Scalability Guide
    • Location: docs/SCALABILITY_GUIDE.md
    • Include: connection pooling, rate limiting, caching strategies

Dependencies: Phase 3.1, Phase 3.2


Pillar 4: Security & Compliance

Goal: Secure-by-default with clear security policies and regular audits.

Phase 4.1: Security Audit (Priority: P0)

Timeline: Month 3 Owner: Core Team + External Auditor

Tasks:

  • Code Security Review
    • Review for SQL injection, XSS, command injection
    • Review API key handling (ensure ApiKey type prevents logging)
    • Review workspace container isolation
  • Dependency Vulnerability Scanning
    • Integrate Snyk or Dependabot
    • Automate vulnerability alerts in CI/CD
  • Document Security Best Practices
    • Location: docs/SECURITY.md
    • Include: API key management, network security, container security

Related Docs: CLAUDE.md (mentions avoiding security vulnerabilities) Dependencies: None

Phase 4.2: Secrets Management (Priority: P0)

Timeline: Month 3 Owner: Core Team

Tasks:

  • Secrets Handling Guidelines
    • Document use of environment variables
    • Recommend vault integration (HashiCorp Vault, AWS Secrets Manager)
  • Prevent Secret Leakage
    • Review ApiKey.toString implementation (already redacted)
    • Audit logging to ensure no secrets in logs
  • Security Policy
    • Create SECURITY.md with vulnerability reporting process

Dependencies: None

Phase 4.3: Compliance Documentation (Priority: P2)

Timeline: Month 6 Owner: Core Team

Tasks:

  • License Compliance
    • Audit all dependencies for license compatibility
    • Document in LICENSES.md
  • GDPR/Privacy Considerations
    • Document data handling for LLM interactions
    • Provide guidance on PII handling
  • Supply Chain Security
    • Sign all release artifacts (already enabled in release.yml)
    • Document build reproducibility

Related Docs: LICENSE (currently Apache 2.0) Dependencies: Phase 4.1


Pillar 5: Documentation & Developer Experience

Goal: Comprehensive, up-to-date documentation that enables rapid onboarding.

Phase 5.1: Documentation Audit (Priority: P0)

Timeline: Month 2 Owner: Community + Core Team

Tasks:

  • Audit Existing Docs
    • Review all .md files for accuracy
    • Identify gaps in coverage
  • Create Missing Guides
    • docs/GETTING_STARTED.md - Quick start beyond README
    • docs/ARCHITECTURE.md - Detailed architecture overview
    • docs/TESTING_GUIDE.md - How to write tests
    • docs/PRODUCTION_DEPLOYMENT.md - Deployment patterns
    • docs/TROUBLESHOOTING.md - Common issues and solutions
  • Update Existing Docs
    • docs/AGENTS.md - Expand with more examples
    • docs/MIGRATION_GUIDE.md - Add 0.x β†’ 1.0 migration
    • docs/tool-calling-api-design.md - Update with latest API

Related Docs: All docs in docs/ Dependencies: None

Phase 5.2: API Documentation (Priority: P0)

Timeline: Month 3 Owner: Core Team

Tasks:

  • ScalaDoc Coverage
    • Ensure all public APIs have ScalaDoc
    • Target: 100% ScalaDoc coverage on public APIs
  • Generate API Documentation Site
    • Use sbt-site or similar
    • Publish to GitHub Pages
  • Interactive Examples
    • Use mdoc or similar for executable docs
    • Embed working code snippets in documentation

Dependencies: Phase 5.1

Phase 5.3: Developer Onboarding (Priority: P1)

Timeline: Month 4 Owner: Community + Core Team

Tasks:

  • Contributor Guide
    • Expand CONTRIBUTING.md
    • Include: coding standards, PR process, review guidelines
  • Video Tutorials
    • Create YouTube playlist with:
      • Getting started (5 min)
      • Building a chatbot (15 min)
      • Advanced: Multi-agent system (30 min)
  • Improve Starter Kit
    • Update llm4s.g8 template
    • Add more example projects

Related Docs: docs/llm4s-g8-starter-kit.md Dependencies: Phase 5.1


Pillar 6: Observability & Operations

Goal: Production-grade observability with monitoring, alerting, and debugging capabilities.

Phase 6.1: Enhanced Tracing (Priority: P1)

Timeline: Month 3 Owner: Core Team

Tasks:

  • Distributed Tracing
    • Integrate OpenTelemetry
    • Support trace context propagation
  • Structured Logging
    • Standardize log formats (JSON logs)
    • Document log levels and verbosity
  • Custom Metrics
    • Add Prometheus metrics exporter
    • Track: request latency, token usage, error rates

Related Docs: docs/langfuse-workflow-patterns.md Dependencies: None

Phase 6.2: Production Monitoring Guide (Priority: P1)

Timeline: Month 4 Owner: Core Team

Tasks:

  • Monitoring Best Practices
    • Location: docs/MONITORING.md
    • Include: key metrics, alerting thresholds
  • Healthcheck Endpoints
    • Add /health and /ready endpoints for LLM clients
    • Document in workspace protocol
  • Error Budget and SLOs
    • Define service level objectives
    • Document in docs/SLO.md

Related Docs: docs/workspace-agent-protocol.md Dependencies: Phase 6.1

Phase 6.3: Operational Runbooks (Priority: P2)

Timeline: Month 5 Owner: Core Team

Tasks:

  • Incident Response Runbooks
    • Common failures: API rate limits, timeouts, out-of-memory
    • Document recovery procedures
  • Capacity Planning Guide
    • Estimate resource requirements for different scales
    • Document in docs/CAPACITY_PLANNING.md

Dependencies: Phase 6.1, Phase 6.2


Pillar 7: Community & Ecosystem

Goal: Thriving community with active contributors and a growing ecosystem.

Phase 7.1: Community Growth (Priority: P1)

Timeline: Ongoing Owner: Maintainers

Tasks:

  • Expand Contributor Base
    • Target: 10+ active contributors
    • Label β€œgood first issue” for new contributors
    • Monthly contributor recognition
  • Regular Dev Hours
    • Continue weekly LLM4S Dev Hour (Sundays 9am London)
    • Publish session notes and recordings
  • Conference Talks
    • Continue presenting at Scala conferences
    • Target: 2-3 talks per quarter

Related Docs: README.md (Dev Hour section) Dependencies: None

Phase 7.2: Ecosystem Integration (Priority: P2)

Timeline: Month 5 Owner: Community + Core Team

Tasks:

  • Framework Integrations
    • Akka/Pekko integration guide
    • ZIO integration guide
    • Cats Effect integration guide
    • Play Framework integration guide
  • Database Integrations
    • Postgres vector extension (pgvector)
    • Elasticsearch integration
    • Qdrant/Weaviate integration
  • Monitoring Integrations
    • Datadog integration
    • New Relic integration

Dependencies: None

Phase 7.3: Plugins and Extensions (Priority: P2)

Timeline: Month 6+ Owner: Community

Tasks:

  • Plugin Architecture
    • Define plugin SPI (Service Provider Interface)
    • Document in docs/PLUGINS.md
  • Community Plugins
    • Encourage community-contributed providers
    • Examples: Google Gemini, Cohere, local models
  • Marketplace/Registry
    • Create plugin registry on llm4s.org
    • Include: verified plugins, ratings, documentation

Dependencies: Phase 2.3 (stable API)


Timeline and Milestones

Overview

Month 1-2: Foundation (Testing + API Audit)
Month 3-4: Hardening (Security + Performance)
Month 5: Stabilization (RC releases)
Month 6+: Launch & Growth (1.0.0 release)

Detailed Timeline

Month Milestone Deliverables Exit Criteria
Month 1 Foundation Setup - Test coverage audit
- API surface documentation
- Security audit initiation
- Coverage report available
- Public API list documented
Month 2 Testing Infrastructure - Unit test coverage >60%
- Integration test framework
- Documentation audit complete
- Coverage passing 60%
- Integration tests runnable
Month 3 Hardening - Security audit complete
- Performance benchmarks
- Enhanced tracing
- No critical vulnerabilities
- Baselines established
Month 4 Optimization - Unit test coverage >80%
- API documentation site
- Monitoring guide
- Coverage passing 80%
- Docs site live
Month 5 Stabilization - 1.0.0-RC1 release
- API freeze
- E2E scenarios
- RC1 published
- No open P0 bugs
Month 6 Launch Prep - 1.0.0-RC2 (if needed)
- Final documentation review
- Launch communications
- Community sign-off
- All P0/P1 tasks complete
Month 6+ 1.0.0 Release - Production release
- Launch blog post
- Community celebration
- 1.0.0 published to Maven Central
Post-1.0 Growth Phase - Plugin ecosystem
- Framework integrations
- Continued improvements
- 3+ community plugins
- 2+ framework guides

Release Candidates Schedule

1.0.0-RC1: Month 5, Week 1
  ↓ (2 weeks of community testing)
1.0.0-RC2: Month 5, Week 3 (if needed)
  ↓ (2 weeks of final validation)
1.0.0:     Month 6, Week 1

Success Metrics

Quantitative Metrics

Category Metric Current Target (1.0) Target (6mo post-1.0)
Quality Statement Coverage ~21% 80% 85%
Quality Critical Bugs Unknown 0 0
Quality Open P0/P1 Issues Unknown <5 <10
Community Contributors 6 (GSoC+2) 10+ 20+
Community GitHub Stars Current +50% +100%
Community Discord Members Current +100 +300
Adoption Maven Central Downloads Current 500/mo 2000/mo
Adoption Production Users 0 5 20
Documentation ScalaDoc Coverage <50% 100% (public APIs) 100%
Documentation Guide Completeness 60% 95% 100%

Qualitative Metrics

  • Developer Satisfaction: Survey developers on ease of use, documentation quality
  • API Stability: Zero unplanned breaking changes in 1.0.x series
  • Community Health: Active Discord discussions, regular contributions
  • Production Readiness: At least 3 case studies of production deployments

Risk Assessment

High-Risk Areas

Risk 1: Low Test Coverage Delays 1.0

Likelihood: High Impact: High Mitigation:

  • Prioritize P0 testing tasks
  • Engage community via β€œtest bounty” program
  • Parallelize test writing across modules

Risk 2: Breaking API Changes Required

Likelihood: Medium Impact: High Mitigation:

  • Thorough API audit in Month 1
  • Early RC releases for feedback
  • Maintain compatibility layer for common patterns

Risk 3: Security Vulnerability Discovered

Likelihood: Medium Impact: High Mitigation:

  • Complete security audit by Month 3
  • Establish security response process
  • Regular dependency scanning

Risk 4: Performance Regressions

Likelihood: Medium Impact: Medium Mitigation:

  • Establish baselines early (Month 2)
  • Add performance tests to CI/CD
  • Monitor JMH benchmarks on every PR

Medium-Risk Areas

Risk 5: Insufficient Documentation

Likelihood: Low Impact: Medium Mitigation:

  • Documentation sprints in Months 2 & 4
  • Community documentation days
  • Reward documentation contributions

Risk 6: Community Contributor Burnout

Likelihood: Medium Impact: Low Mitigation:

  • Distribute work across multiple contributors
  • Recognize and reward contributions
  • Maintain sustainable pace

Appendix

Based on this roadmap, we recommend creating the following GitHub issues:

Testing & Quality:

  • #TBD: Achieve 80% statement coverage across core modules
  • #TBD: Create integration test framework
  • #TBD: Add E2E test scenarios for reference applications
  • #TBD: Enable coverage enforcement in CI/CD

API Stability:

  • #TBD: Document public API surface area
  • #TBD: Create versioning policy document
  • #TBD: Deprecation and migration path for 0.x APIs
  • #TBD: API freeze for 1.0.0-RC1

Performance:

  • #TBD: Set up JMH benchmarking framework
  • #TBD: Establish performance baselines
  • #TBD: Memory profiling and optimization
  • #TBD: Scalability testing and documentation

Security:

  • #TBD: Conduct security audit
  • #TBD: Integrate dependency vulnerability scanning
  • #TBD: Create SECURITY.md with reporting process
  • #TBD: Review and audit secrets management

Documentation:

  • #TBD: Documentation audit and gap analysis
  • #TBD: Create missing documentation guides
  • #TBD: 100% ScalaDoc coverage on public APIs
  • #TBD: Set up API documentation site (GitHub Pages)

Observability:

  • #TBD: Integrate OpenTelemetry for distributed tracing
  • #TBD: Add Prometheus metrics exporter
  • #TBD: Create monitoring best practices guide
  • #TBD: Add healthcheck endpoints

Community:

  • #TBD: Label β€œgood first issues” for new contributors
  • #TBD: Create framework integration guides (ZIO, Cats Effect, etc.)
  • #TBD: Define plugin architecture

C. Contributing to This Roadmap

This roadmap is a living document. To propose changes:

  1. Open an issue on GitHub with the roadmap label
  2. Discuss in the #roadmap Discord channel
  3. Submit a PR updating this document
  4. Maintainers will review and merge approved changes

D. Roadmap Tracking

Progress on this roadmap will be tracked via:

  • GitHub Project Board: LLM4S Production Roadmap
  • Monthly Updates: Published on Discord and mailing list
  • Quarterly Reviews: Major milestones reviewed by maintainers and community

Document Version: 1.0 Next Review: 2025-12-15 Maintainers: Rory Graves, Kannupriya Kalra Contributors: Community input welcome via GitHub issues